Qingdao Agile Int’l logistic bonded warehouse covers about 20000 square meters, and equipped with many advanced environmental battery forklift, combustion forklift, hydraulic forklift and other special loading and unloading facility. We have many loading and unloading work area to ensure prompt loading and unloading of goods as they arrive or deliver. We also have guards who patrol 24 hours to ensure goods’safe.
Every rules and regulations of the company are complete, and well-managed. There are experienced storekeepers, and staffs who load and unload goods.
Structure of the building :
(一) frame structure of the warehouse:
Agile has three storeys frame structure of the warehouse, every floor high 4.2M, total high 14M, and each floor covers 1100 square meters, total covers 3300 square meters. The warehouse is through the ground of wear-resisting and dampproof treatment. The warehouse has fine ventilation. In addition, each floor has two fire doors, and equipped with a cargo lift.
(二) steal structure of the warehouse:
Agile has a more scientific and well equipped steal structure of the warehouse. The floor high 7.0M,coping high 10.0M. The warehouse is through the ground of dampproof treatment, while piling up the goods, the ground floor adds a tray to underlay, get up the further dampproof measure.
Other equipments:
The warehouse furnished with two cargo lifts, emergency exit, fire escape, special fire-fighting facilities, and all kinds of 6 hydraulic presses for loading and unloading uses. Load and unload platform is 20*4M *1.5M (long * wide * high ). |